Define performance measures that will be displayed to applicants on the opportunity and that will flow into awarded contracts.
Prerequisites: You must have Edit/Admin access to an existing opportunity in edit mode with Performance Settings enabled.
- Click Program Management > Opportunities
- Click on an Opportunity Name
- Click Performance > Measures
- Click the (Add icon) in the icon bar
- In the Add Measure pop-up, enter:
- Enter the following information:
- Measure Name (required): What is this measure called?
- Type (required): Select one of three options:
- Milestone: Yes/No completion (for example, "Training completed")
- Number: Numeric value (for example, "Staff hired: 10")
- Percent: Percentage (for example, "Percent of target population served")
- Description (required): Explain what this measure tracks and why it matters.
- Target (for Number and Percent types, optional): Set your goal value.
- Allow Applicants to Propose Target: Check if applicants can suggest their own target (optional; Number/Percent only)
- Click Create.
Comments
0 comments
Please sign in to leave a comment.